Owner: Army Corp Of Engineers Architect: Army Corp Of Engineers Project Value: $33million Date Of Completion: April 2005 Project Type: Flood Channel Area: 2.5 Miles Project Description: Cast In Place Concrete Channels. Construction Included A Detention Basin With Roller Compacted Concrete Walls, Maintaining Maintenance Roads During Construction , Dust Control, Channel Excavation At Required Lay Back Slopes, Seismic Monitoring, Tortoise Control, Pipe Supports And Utility Relocation, Survey Staking, Striping And Signage, Material Testing And Control, And Reinforcing Steel, Double And Single Swing Chain Link Fencing, Post And Cable Railing Systems, And Tortoise Fencing.