Project Value: $5.6million Owner: Hope Baptist Church Contact: Jay Hendrix, 702-896-5924 Project Type: Assembly / Office Concrete Subcontractor: Concrete Systems Completed: 2011 Project Description: Worship Center Was 16,000 Square Feet, And Building B – Administration / School Building Was 27,000 Square Feet. Both Buildings Consisted Of Site Preparation, Grading, Underground Wet Utilities, Concrete Work, Masonry Site Walls, Chain Link Fencing, Landscape And Irrigation, Structural Steel, Metal Joist And Deck, Single Ply Roofing, Glass And Glazing, Stained Concrete Floors, Metal Building Panels, Aluminum Storefronts, Tubular Skylights, Flooring, Architectural Casework, Solid Surface Counter Tops, Window Coverings, Operable Partitions, As Well As, Full Mechanical, Plumbing, Electrical, Fire Sprinklers, Low Voltage, And Audio Visual Systems.